Show simple item record

contributor authorPeter E. D. Love
date accessioned2017-05-08T20:34:00Z
date available2017-05-08T20:34:00Z
date copyrightFebruary 2002
date issued2002
identifier other%28asce%290733-9364%282002%29128%3A1%2818%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/19765
description abstractWhile it is widely recognized that additional costs due to rework can have an adverse effect on project performance, limited empirical research has been done to investigate the influencing factors. The research presented in this paper aims to determine the influence of different project types and procurement methods on rework costs in construction projects. Using a questionnaire survey, rework costs were obtained from 161 Australian construction projects. The direct and indirect consequences of rework are analyzed and discussed. It is shown that, contrary to expectation, rework costs do not differ relative to project type or procurement method. In addition, it was found rework contributed to 52% of a project’s cost growth and that 26% of the variance in cost growth was attributable to changes due to direct rework. To reduce rework costs and therefore improve project performance, it is posited that construction organizations begin to consider and measure them, so that an understanding of their magnitude can be captured, root causes identified, and effective prevention strategies implemented.
publisherAmerican Society of Civil Engineers
titleInfluence of Project Type and Procurement Method on Rework Costs in Building Construction Projects
typeJournal Paper
journal volume128
journal issue1
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(2002)128:1(18)
treeJournal of Construction Engineering and Management:;2002:;Volume ( 128 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record