Show simple item record

contributor authorHsiao-Wei D. Chiang
contributor authorPai-Yi Wang
contributor authorHsin-Lung Li
date accessioned2017-05-08T20:32:55Z
date available2017-05-08T20:32:55Z
date copyrightMarch 2010
date issued2010
identifier other%28asce%290733-9402%282010%29136%3A1%2811%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/19244
description abstractWith increasing demand for power and with shortages envisioned especially during the peak load times during the summer, there is a need to boost gas turbine power. In Taiwan, most gas turbines operate in combined cycle mode for base load. Only a small portion of gas turbines operates in simple cycle mode for peak load. To prevent the electric shortage due to derating of power plants during hot days, the power augmentation strategies for combined cycles need to be studied in advance. As a solution, our objective is to add an overspray inlet fogging system into an existing gas turbine-based combined cycle power plant (CCPP) to study the effects. Simulation runs were made for adding an overspray inlet fogging system to the CCPP under various ambient conditions. The overspray percentage effects on the CCPP thermodynamic performance are also included in this paper. Results demonstrated that the CCPP net power augmentation depends on the percentage of overspray under site average ambient conditions. This paper also included CCPP performance parametric studies to propose overspray inlet fogging guidelines for combined cycle power augmentation.
publisherAmerican Society of Civil Engineers
titleCombined Cycle Power Augmentation by Overspray Inlet Fogging
typeJournal Paper
journal volume136
journal issue1
journal titleJournal of Energy Engineering
identifier doi10.1061/(ASCE)0733-9402(2010)136:1(11)
treeJournal of Energy Engineering:;2010:;Volume ( 136 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record