YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-3 of 3

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Flexible Activity Relations to Support Optimum Schedule Acceleration 

    Source: Journal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 011
    Author(s): Zinab Abuwarda; Tarek Hegazy
    Publisher: American Society of Civil Engineers
    Request PDF

    Work-Package Planning and Schedule Optimization for Projects with Evolving Constraints 

    Source: Journal of Computing in Civil Engineering:;2016:;Volume ( 030 ):;issue: 006
    Author(s): Zinab Abuwarda; Tarek Hegazy
    Publisher: American Society of Civil Engineers
    Abstract: Planning and scheduling are challenging processes, particularly for projects with continuously evolving requirements and constraints such as design-build and turnkey projects. In the literature, schedule optimization models ...
    Request PDF

    Optimizing Construction Work–Rest Schedules and Worker Reassignment Utilizing Wristband Physiological Data 

    Source: Journal of Construction Engineering and Management:;2024:;Volume ( 150 ):;issue: 011:;page 04024149-1
    Author(s): Zinab Abuwarda; Kareem Mostafa; Plinio Morita; Tarek Hegazy
    Publisher: American Society of Civil Engineers
    Abstract: Construction workers are exposed to long physically demanding work hours and require sufficient work rests to avoid strenuous fatigue, productivity loss, and adverse health effects. In the literature, limited efforts ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian