Search
Now showing items 1-2 of 2
Innovative Construction Method for Oversized Excavations with Bipartition Walls
Publisher: American Society of Civil Engineers
Abstract: This paper presents an innovative construction method with bipartition walls (BPW), which was developed to reduce the excavation-induced adverse impact on the supporting structures and surrounding environment in oversized ...
Responses of a Newly Built Metro Line Connected to Deep Excavations in Soft Clay
Publisher: American Society of Civil Engineers
Abstract: Excavation-induced ground settlement causes adverse impact or damage on adjacent facilities. If a foundation pit is connected to the facilities, the responses of the facilities can be influenced by soil inside the pit. ...