YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-4 of 4

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Optimal Bid Model for Price-Time Biparameter Construction Contracts 

    Source: Journal of Construction Engineering and Management:;1999:;Volume ( 125 ):;issue: 003
    Author(s): Liyin Shen; Derek Drew; Zhihui Zhang
    Publisher: American Society of Civil Engineers
    Abstract: Construction clients are increasingly calling for bids that require competing contractors to submit both the bid price and contract time. In such situations contractors are faced with the problem of deciding which combination ...
    Request PDF

    Ontology-Based Knowledge Model to Support Construction Noise Control in China 

    Source: Journal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 002
    Author(s): Jun Xiao; Xiaodong Li; Zhihui Zhang; Jianhan Zhang
    Publisher: American Society of Civil Engineers
    Abstract: Construction noise control (CNC) is the process of identifying potential noise emissions and establishing noise-abatement plans to mitigate pollution impacts, a process that requires interdisciplinary knowledge and ...
    Request PDF

    Prefabricated Construction Process Optimization Based on Rework Risk 

    Source: Journal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 006:;page 04022031
    Author(s): Kaicheng Shen; Xiaodong Li; Xinying Cao; Zhihui Zhang
    Publisher: ASCE
    Abstract: In prefabricated construction (PC) projects, component manufacturing and site construction are implemented concurrently to improve productivity. However, concurrent PC provides feedback information on each task, and ...
    Request PDF

    Application of BOT System for Infrastructure Projects in China 

    Source: Journal of Construction Engineering and Management:;1996:;Volume ( 122 ):;issue: 004
    Author(s): Liyin Shen; Rowson K. H. Lee; Zhihui Zhang
    Publisher: American Society of Civil Engineers
    Abstract: The Build-Operate-Transfer (BOT) concept has now become an accepted means of securing private-sector involvement in infrastructure projects. The popularity of BOT mechanisms is growing in the developing countries, which ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian