Search
Now showing items 1-2 of 2
Achieving Minimum Settling Time Subject to Undershoot Constraint in Systems With One or Two Real Right Half Plane Zeros
Publisher: The American Society of Mechanical Engineers (ASME)
Abstract: This note concerns with the problem of achieving minimum settling time in linear systems with one or two real right half plane (RHP) zeros subject to the condition that undershoot does not exceed a given threshold. Such ...
Predicting Collision Risk between Trucks and Interstate Overpasses
Publisher: American Society of Civil Engineers