Construction Cost and Duration Uncertainty Model: Application to High-Speed Rail Line Project
Publisher: American Society of Civil Engineers
Abstract: Transportation construction projects are often plagued by cost overruns and delays. Applying contingencies and estimating risks at the project level often do not capture the multiple uncertainties in the construction process ...
Modeling Correlations in Rail Line Construction
Publisher: American Society of Civil Engineers
Abstract: The total construction cost and time of projects are often overrun. It is known that when positive correlations between costs are disregarded, the range of possible total construction costs is underestimated. A model is ...
Experience in Expert Estimation of Probabilities and Correlations for Rail Line Construction
Publisher: American Society of Civil Engineers
Abstract: To counteract cost escalation and delays in infrastructure construction, an estimation model has been developed that simulates project uncertainty with probability distributions, correlations, and disruptive events. When ...