YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-3 of 3

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Investigation into Cause of Failure of 22 kV PILC Cable 

    Source: Journal of Performance of Constructed Facilities:;1998:;Volume ( 012 ):;issue: 003
    Author(s): Yoke Lin Tan
    Publisher: American Society of Civil Engineers
    Abstract: An underground 22 kV screened paper insulated lead-covered cable with steel tape armor, installed in 1960, was tripped out of service twice due to insulation failure as a result of alleged negligence by the contractor, who ...
    Request PDF

    Heat Damage Assessment of Oil Immersed Transformer 

    Source: Journal of Performance of Constructed Facilities:;2000:;Volume ( 014 ):;issue: 002
    Author(s): Yoke Lin Tan
    Publisher: American Society of Civil Engineers
    Abstract: An outdoor distribution oil immersed transformer on the premises of a factory was exposed to intense heat due to a fire that occurred at a neighboring factory. The licensed electrical worker for the premises where the ...
    Request PDF

    Investigation into Cause of Failure of Lift Control Panel 

    Source: Journal of Performance of Constructed Facilities:;1999:;Volume ( 013 ):;issue: 003
    Author(s): Yoke Lin Tan; Kok Chye Liam
    Publisher: American Society of Civil Engineers
    Abstract: A fire broke out in the lift control room of a new high-rise office tower block. The initiating source of the fire was traced to a lift group control panel and the area around the neutral incoming terminal of a circuit ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian