YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-3 of 3

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Study on Development Patterns of Infrastructure Projects 

    Source: Journal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 002
    Author(s): Sudong Ye; Yisheng Liu
    Publisher: American Society of Civil Engineers
    Abstract: From case studies, it was found that the practices of infrastructure development can be abstracted into development patterns. Based on the findings, this paper first investigated possible task allocations between the public ...
    Request PDF

    Hybrid Rescheduling Optimization Model under Disruptions in Precast Production Considering Real-World Environment 

    Source: Journal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 004:;page 04021012-1
    Author(s): Zhaojing Wang; Yisheng Liu; Hao Hu; Lei Dai
    Publisher: ASCE
    Abstract: Increased emphasis is currently placed on precast production scheduling due to the upward-trending applications of precast technology. However, existing studies primarily focused on static scheduling, and few of them ...
    Request PDF

    Solving Resource-Constrained Project Scheduling Problem via Genetic Algorithm 

    Source: Journal of Computing in Civil Engineering:;2020:;Volume ( 034 ):;issue: 002
    Author(s): Jia Liu; Yisheng Liu; Ying Shi; Jian Li
    Publisher: ASCE
    Abstract: The resource-constrained project scheduling problem (RCPSP) is an important and challenging problem in the field of construction management. This paper presents a genetic algorithm (GA) for the RCPSP. The proposed algorithm ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian