YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-5 of 5

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    SIM-UTILITY: Model for Project Ceiling Price Determination 

    Source: Journal of Construction Engineering and Management:;2002:;Volume ( 128 ):;issue: 001
    Author(s): Wei-Chih Wang
    Publisher: American Society of Civil Engineers
    Abstract: Before considering bids submitted by competing contractors for a public procurement project, the owner should determine a project ceiling price or cost estimate to use as a reference point for evaluating the bids. A high ...
    Request PDF

    Closure to “Electronic-Based Procedure for Managing Unbalanced Bids” by Wei-Chih Wang 

    Source: Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 009
    Author(s): Wei-Chih Wang
    Publisher: American Society of Civil Engineers
    Request PDF

    Electronic-Based Procedure for Managing Unbalanced Bids 

    Source: Journal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 003
    Author(s): Wei-Chih Wang
    Publisher: American Society of Civil Engineers
    Abstract: Construction lump sum lowest bid procurement is one of the most prevalent methods of awarding construction contracts. For a lump sum bidding practice in Taiwan, after the lowest bidder is awarded a construction project ...
    Request PDF

    Model for Evaluating Networks under Correlated Uncertainty—NETCOR 

    Source: Journal of Construction Engineering and Management:;2000:;Volume ( 126 ):;issue: 006
    Author(s): Wei-Chih Wang; Laura A. Demsetz
    Publisher: American Society of Civil Engineers
    Abstract: Construction activities are often influenced by factors such as weather, labor, and site conditions. When several activities are influenced by the same factor, their durations may be correlated. If many activities along a ...
    Request PDF

    Application Example for Evaluating Networks Considering Correlation 

    Source: Journal of Construction Engineering and Management:;2000:;Volume ( 126 ):;issue: 006
    Author(s): Wei-Chih Wang; Laura A. Demsetz
    Publisher: American Society of Civil Engineers
    Abstract: Current approaches to network scheduling do not consider the correlation between activity durations. When activity durations are correlated, the variability of path and project durations may be increased. High variability ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian