YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-10 of 63

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Optimization of Resource Allocation and Leveling Using Genetic Algorithms 

    Source: Journal of Construction Engineering and Management:;1999:;Volume ( 125 ):;issue: 003
    Author(s): Tarek Hegazy
    Publisher: American Society of Civil Engineers
    Abstract: Resource allocation and leveling are among the top challenges in project management. Due to the complexity of projects, resource allocation and leveling have been dealt with as two distinct subproblems solved mainly using ...
    Request PDF

    Closure to “Reconstruction of the Building Infrastructure: Two Performance Prediction Models” by Mohamed Attalla, Tarek Hegazy, and Ralph Haas 

    Source: Journal of Infrastructure Systems:;2005:;Volume ( 011 ):;issue: 004
    Author(s): Tarek Hegazy
    Publisher: American Society of Civil Engineers
    Request PDF

    Computerized System for Efficient Delivery of Infrastructure Maintenance/Repair Programs 

    Source: Journal of Construction Engineering and Management:;2006:;Volume ( 132 ):;issue: 001
    Author(s): Tarek Hegazy
    Publisher: American Society of Civil Engineers
    Abstract: This paper discusses three common approaches used by owner organizations to deliver infrastructure maintenance/repair (M/R) programs that involve multiple distributed sites: using in-house resources, outsourcing to ...
    Request PDF

    Discussion of “Permutation-Based Elitist Genetic Algorithm for Optimization of Large-Sized Resource-Constrained Project Scheduling” by Jin-Lee Kim and Ralph D. Ellis Jr. 

    Source: Journal of Construction Engineering and Management:;2010:;Volume ( 136 ):;issue: 006
    Author(s): Tarek Hegazy
    Publisher: American Society of Civil Engineers
    Request PDF

    Discussion of “Time-Profit Trade-Off Analysis for Construction Projects” by Ahmed Senouci and Khaled El-Rayes 

    Source: Journal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 001
    Author(s): Tarek Hegazy
    Publisher: American Society of Civil Engineers
    Request PDF

    Closure to “Improving Design Coordination for Building Projects. I: Information Model” by Tarek Hegazy, Essam Zaneldin, and Donald Grierson 

    Source: Journal of Construction Engineering and Management:;2003:;Volume ( 129 ):;issue: 004
    Author(s): Tarek Hegazy
    Publisher: American Society of Civil Engineers
    Request PDF

    Flexible Activity Relations to Support Optimum Schedule Acceleration 

    Source: Journal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 011
    Author(s): Zinab Abuwarda; Tarek Hegazy
    Publisher: American Society of Civil Engineers
    Request PDF

    Discussion of “Ant Colony Optimization for Multimode Resource-Constrained Project Scheduling” by Hong Zhang 

    Source: Journal of Management in Engineering:;2014:;Volume ( 030 ):;issue: 003
    Author(s): Wail Menesi; Tarek Hegazy
    Publisher: American Society of Civil Engineers
    Request PDF

    Multimode Resource-Constrained Scheduling and Leveling for Practical-Size Projects 

    Source: Journal of Management in Engineering:;2015:;Volume ( 031 ):;issue: 006
    Author(s): Wail Menesi; Tarek Hegazy
    Publisher: American Society of Civil Engineers
    Abstract: This paper aims at providing a fast near-optimum solution to the multimode resource-constrained project scheduling problem (MRCPSP) in large-scale projects, with and without resource-leveling constraints. The MRCPSP problem ...
    Request PDF

    Cost Optimization in Projects with Repetitive Nonserial Activities 

    Source: Journal of Construction Engineering and Management:;2001:;Volume ( 127 ):;issue: 003
    Author(s): Tarek Hegazy; Nagib Wassef
    Publisher: American Society of Civil Engineers
    Abstract: A practical model for scheduling and cost optimization of repetitive projects is proposed in this paper. The model objective is to minimize total construction cost comprising direct cost, indirect cost, interruption cost, ...
    Request PDF
    • 1
    • 2
    • 3
    • 4
    • . . .
    • 7
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    ... View More

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian