Challenges in Engineering Estimates for Best Value Design–Build Highway Projects
Publisher: ASCE
Abstract: Traditional design–bid–build guidelines suggest that engineering estimates should be within +/−10% of the lowest contractor bid and recommend this value as a reference to identify anomalies in the bidding process. This ...