YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-6 of 6

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Optimal Repetitive Scheduling Model with Shareable Resource Constraint 

    Source: Journal of Construction Engineering and Management:;2001:;Volume ( 127 ):;issue: 004
    Author(s): Sou-Sen Leu; Shao-Ting Hwang
    Publisher: American Society of Civil Engineers
    Abstract: An optimal repetitive scheduling model for precast production with the consideration of resource constraints and resource sharing is proposed in this paper. A repetitive schedule, like precast production, needs to take ...
    Request PDF

    Project Performance Evaluation Based on Statistical Process Control Techniques 

    Source: Journal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 010
    Author(s): Sou-Sen Leu; You-Che Lin
    Publisher: American Society of Civil Engineers
    Abstract: The earned value management (EVM) method is considered as a powerful tool that supports the management of project scope, time, and cost. However, conventional EVM may cause some project managers to ignore the information ...
    Request PDF

    Average‐Bid Method—Competitive Bidding Strategy 

    Source: Journal of Construction Engineering and Management:;1993:;Volume ( 119 ):;issue: 001
    Author(s): Photios G. Ioannou; Sou‐Sen Leu
    Publisher: American Society of Civil Engineers
    Abstract: The major drawback of the low‐bid method, often used for competitive bidding in the U.S. construction industry, is the possibility of awarding a construction contract to a contractor that submits, either accidentally or ...
    Request PDF

    GA-Based Multicriteria Optimal Model for Construction Scheduling 

    Source: Journal of Construction Engineering and Management:;1999:;Volume ( 125 ):;issue: 006
    Author(s): Sou-Sen Leu; Chung-Huei Yang
    Publisher: American Society of Civil Engineers
    Abstract: Resources for construction activities are limited in the real construction world. To avoid the waste and shortage of resources on a construction jobsite, scheduling must include resource allocation. A multicriteria ...
    Request PDF

    Fuzzy Optimal Model for Resource-Constrained Construction Scheduling 

    Source: Journal of Computing in Civil Engineering:;1999:;Volume ( 013 ):;issue: 003
    Author(s): Sou-Sen Leu; An-Ting Chen; Chung-Huei Yang
    Publisher: American Society of Civil Engineers
    Abstract: Activity duration is uncertain due to the variation in the outside environment, such as weather, site congestion, productivity level, etc. Furthermore, resources for construction activities are limited in the real construction ...
    Request PDF

    Hybrid Bayesian Fuzzy-Game Model for Improving the Negotiation Effectiveness of Construction Material Procurement 

    Source: Journal of Computing in Civil Engineering:;2015:;Volume ( 029 ):;issue: 006
    Author(s): Sou-Sen Leu; Pham Vu Hong Son; Pham Thi Hong Nhung
    Publisher: American Society of Civil Engineers
    Abstract: Price negotiation is commonly required to reach a final contractual agreement during the procurement of construction material. However, uncertain and limited supplier information as well as complex correlations among various ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian