Automated Real-Time Monitoring System to Measure Shift Production of Tunnel Construction Projects
Publisher: American Society of Civil Engineers
Abstract: The productivity of a tunnel construction project can deviate from the predicted plan due to many factors, such as equipment failure, weather conditions and unexpected soil characteristics. Early detection of such deviations ...
Artificial Neural Network Model for Cost Estimation: City of Edmonton’s Water and Sewer Installation Services
Publisher: American Society of Civil Engineers
Abstract: Over the years of the study (1999–2004) presented in this paper, the City of Edmonton, Canada’s Drainage and Maintenance Department has experienced an annual increase of about 12% in the installation of water and sewer ...