Search
Now showing items 1-1 of 1
Heuristic Methods for Dynamic Multiproject Scheduling Problems with Stochastic Transfer Times
Publisher: American Society of Civil Engineers
Abstract: In practice, activities of the construction multiproject use limited resources in different locations, which requires resources to be transferred frequently between projects or activities. In this study, we simultaneously ...