YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-6 of 6

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    An Empirical Analysis of Project Performance Outcomes for Best-Value Procurement in Design–Bid–Build Projects 

    Source: Journal of Management in Engineering:;2021:;Volume ( 037 ):;issue: 003:;page 04021005-1
    Author(s): Brian C. Lines; Phuong H. D. Nguyen; Raghu Kakarapalli
    Publisher: ASCE
    Abstract: The best-value (BV) procurement method has been increasingly used by owners in the context of design–bid–build (DBB) project delivery. The objective of this study was to determine whether a statistically significant ...
    Request PDF

    Exploring the Use of Quality Control Plans for Alternative Contracting Methods in Highway Projects 

    Source: Journal of Construction Engineering and Management:;2024:;Volume ( 150 ):;issue: 005:;page 04024030-1
    Author(s): Phuong H. D. Nguyen; Daniel Tran
    Publisher: ASCE
    Abstract: Quality control (QC) is an essential component of quality assurance (QA) programs used to monitor and ensure the highway construction projects’ quality. After receiving the contractor’s QC plan, state departments of ...
    Request PDF

    Optimizing Snow and Ice Route Removal Operations Using Vehicle Routing Problems and Geographic Information System 

    Source: Journal of Cold Regions Engineering:;2024:;Volume ( 038 ):;issue: 002:;page 04024001-1
    Author(s): Phuong H. D. Nguyen; Daniel Tran
    Publisher: ASCE
    Abstract: Snow and ice route removal activities play an essential role in travelers’ safety and roadways’ reliability. They often require the deployment of a large number of snowplow trucks on a vast maintenance area and involve a ...
    Request PDF

    Fuzzy Set Theory Approach to Classify Highway Project Characteristics for Delivery Selection 

    Source: Journal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 005
    Author(s): Phuong H. D. Nguyen; Daniel Tran; Brian C. Lines
    Publisher: ASCE
    Abstract: Selecting an appropriate delivery method for highway projects is a complex decision process. Delivery decisions typically involve evaluating both quantitative (e.g., cost, schedule) and qualitative (e.g., project ...
    Request PDF

    Empirical Inference System for Highway Project Delivery Selection Using Fuzzy Pattern Recognition 

    Source: Journal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 012
    Author(s): Phuong H. D. Nguyen; Dai Q. Tran; Brian C. Lines
    Publisher: ASCE
    Abstract: Selection of a project delivery method in highway construction is a challenging task because of the many decision criteria involved. In addition to quantitative project attributes, the project delivery decision-making ...
    Request PDF

    Evaluation of Cost Growth Factors in Design-Build Highway Projects Using Structural Equation Modeling 

    Source: Journal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 007:;page 04021070-1
    Author(s): Sharon A. Mathew; Dai Q. Tran; Phuong H. D. Nguyen
    Publisher: ASCE
    Abstract: Design-build (DB) project delivery is often used to overcome limitations of the traditional design-bid-build delivery method. Identification of project performance influencing factors is important for selecting a project ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian