YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-4 of 4

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Uncertainty-Aware Linear Schedule Optimization: A Space-Time Constraint-Satisfaction Approach 

    Source: Journal of Construction Engineering and Management:;2017:;Volume ( 143 ):;issue: 005
    Author(s): Nazila Roofigari-Esfahan; Saiedeh Razavi
    Publisher: American Society of Civil Engineers
    Request PDF

    Discussion of “Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search” by Zong Woo Geem 

    Source: Journal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 008
    Author(s): Osama Moselhi; Nazila Roofigari-Esfahan
    Publisher: American Society of Civil Engineers
    Request PDF

    Practical Deployment of BIM-Interoperable Voice-Based Intelligent Virtual Agent Support Construction Worker Productivity 

    Source: Journal of Construction Engineering and Management:;2024:;Volume ( 150 ):;issue: 011:;page 04024153-1
    Author(s): Daniel Antonio Linares-Garcia; Nazila Roofigari-Esfahan
    Publisher: American Society of Civil Engineers
    Abstract: The architecture, engineering, and construction (AEC) industry in the US faces increasing labor shortages while accumulating downward productivity trends. Previous research efforts have shown that lack of timely access to ...
    Request PDF

    Location-Aware Scheduling and Control of Linear Projects: Introducing Space-Time Float Prisms 

    Source: Journal of Construction Engineering and Management:;2015:;Volume ( 141 ):;issue: 001
    Author(s): Nazila Roofigari-Esfahan; Antonio Paez; Saiedeh N.Razavi
    Publisher: American Society of Civil Engineers
    Abstract: Space and time planning of construction activities is a key factor affecting safety and field performance in construction sites. When scheduling and controlling linear projects, identification of potential congestion and/or ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian