Discussion of “Flexible Model for Time/Cost Tradeoff Problem” by John Moussourakis and Cengiz Haksever
Publisher: American Society of Civil Engineers
Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows
Publisher: American Society of Civil Engineers
Abstract: Traditional time-cost trade-off (TCTO) analysis assumes constant value of activities’ cost along the project time span. However, the value of money decreases with time and, therefore, discounted cash flows should be ...
LOB and CPM Integrated Method for Scheduling Repetitive Projects
Publisher: American Society of Civil Engineers
Abstract: Repetitive projects require schedules that ensure the uninterrupted usage of resources from a unit to similar units in a repetitive activity while maintaining logical dependency constraints. The critical path method (CPM) ...
Closure to “Algorithm for Determining Controlling Path Considering Resource Continuity” by Mohammad A. Ammar and Emad Elbeltagi
Publisher: American Society of Civil Engineers
Algorithm for Determining Controlling Path Considering Resource Continuity
Publisher: American Society of Civil Engineers
Abstract: Scheduling of construction projects that have multiple units, wherein activities repeat from one unit to another, always represent a major challenge to project managers. These projects require schedules that ensure the ...
Optimal Construction Site Layout Considering Safety and Environmental Aspects
Publisher: American Society of Civil Engineers
Abstract: A good site layout is vital to ensure the safety of the working environment and effective and efficient operations. Site layout planning has significant impacts on productivity, costs, and duration of construction. ...