YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-6 of 6

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    High Stakes Construction Mediation: Does the “Hype” Justify the “Hope” 

    Source: Journal of Professional Issues in Engineering Education and Practice:;2004:;Volume ( 130 ):;issue: 003
    Author(s): Michael C. Loulakis
    Publisher: American Society of Civil Engineers
    Request PDF

    Risk Allocation Clause Enforced in North Carolina 

    Source: Civil Engineering Magazine Archive:;2008:;Volume ( 078 ):;issue: 005
    Author(s): Michael C. Loulakis; Lauren P. McLaughlin
    Publisher: American Society of Civil Engineers
    Request PDF

    Liability of Designers to Contractors for Proposal-Related Claims in Design-Build Contracts 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2022:;Volume ( 014 ):;issue: 004:;page 04522019
    Author(s): Michael C. Loulakis; Douglas D. Gransberg
    Publisher: ASCE
    Abstract: Design-build (DB) project proposals generally require the designer on the DB team to advance the level of design provided by the owner in the request for proposals (RFP) to a stage where a firm fixed price can be proposed. ...
    Request PDF

    Contractual Approaches to Address Geotechnical Uncertainty in Design-Build Public Transportation Projects 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2017:;Volume ( 009 ):;issue: 001
    Author(s): Carla Lopez del Puerto; Douglas D. Gransberg; Michael C. Loulakis
    Publisher: American Society of Civil Engineers
    Request PDF

    Confidentiality Issues with Alternative Technical Concepts during Design-Build Project Procurement 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 001
    Author(s): Ghada M. Gad; Michael C. Loulakis; Douglas Gransberg
    Publisher: ASCE
    Abstract: Research has shown that maintaining confidentiality is critical to creating an environment where competing design-builders feel comfortable disclosing innovative alternative technical concepts (ATCs) during the procurement ...
    Request PDF

    Emergency Megaproject Case Study Protest: The Interstate Highway 35 West Bridge 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2017:;Volume ( 009 ):;issue: 003
    Author(s): Carla Lopez del Puerto; Eric Scheepbouwer; Douglas D. Gransberg; Michael C. Loulakis
    Publisher: American Society of Civil Engineers
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian