Search
Now showing items 1-2 of 2
Modification of Advanced Programmatic Risk Analysis and Management Model for the Whole Project Life Cycle’s Risks
Publisher: American Society of Civil Engineers
Abstract: The advanced programmatic risk analysis and management model (APRAM) is one of the recently developed methods that can be used for risk analysis and management purposes considering schedule, cost, and quality risks ...
Worksite Accident Impacts on Construction and Infrastructure: Nondeterministic Analysis of Subsectors and Organization Sizes
Publisher: ASCE
Abstract: Worksite accidents in the construction and infrastructure industries result in cost overruns and schedule downtimes. Previous research has analyzed cost and schedule deviations caused by worksite accidents within these ...
CSV
RIS