YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-3 of 3

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    BIM-Enabled Streaming of Changes and Potential Claims Induced by Fast-Tracking Design-Build Projects 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 013 ):;issue: 001:;page 04520042-1
    Author(s): Mayssa Kalach; Mohamed-Asem Abdul-Malak; Issam Srour
    Publisher: ASCE
    Abstract: Under contractor-led design-build (DB) projects where fast-tracking is commonly exercised, design information may be incompatibly coordinated and pressured to be released prematurely for construction. This potential ...
    Request PDF

    Liability Exposure and Indemnity for Architecture and Engineering Professionals Acting as Independent Consultants or Design Subcontractors 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2019:;Volume ( 011 ):;issue: 004
    Author(s): Mayssa Kalach; Mohamed-Asem Abdul-Malak; Issam Srour
    Publisher: American Society of Civil Engineers
    Abstract: Given the multiple approaches currently used by owners for the procurement of construction projects, design professionals end up undertaking their design and other related services either as independent consultants appointed ...
    Request PDF

    Architect and Engineer’s Spectrum of Engagement under Alternative Delivery Methods: Agreement Negotiation and Formation Implications 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 001
    Author(s): Mayssa Kalach; Mohamed-Asem Abdul-Malak; Issam Srour
    Publisher: ASCE
    Abstract: The proliferation of the several alternatives to the traditional design-bid-build (DBB) project delivery method (PDM), coupled with the ever-increasing demand to reach a faster delivery of construction projects, may commonly ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian