Scheduling with Computer-Interpretable Construction Method Models
Publisher: American Society of Civil Engineers
Abstract: Current scheduling tools require the manual translation of design information to activities and typically do not provide dynamic links between cost estimates and corresponding schedules. To take advantage of the increasingly ...
Importance of Capacity Constraints to Construction Cost and Schedule
Publisher: American Society of Civil Engineers
Abstract: This paper makes a practice-based critique of the assumptions behind network planning methods from the perspective of subcontractors and suppliers. In the context of a case example, the time-cost trade-off and its ...
Knowledge and Reasoning for MEP Coordination
Publisher: American Society of Civil Engineers
Abstract: The coordination of mechanical, electrical, and plumbing (MEP) systems is a major challenge for complex buildings and industrial plants. The process involves locating equipment and routing connecting elements for each ...