Importance of Noncost Criteria Weighing in Best-Value Design–Build US Highway Projects
Publisher: ASCE
Abstract: United States highway agencies use best-value procurement with a fixed price to select design builders. This method enables public agencies to choose the best proposer by assessing several factors in addition to price. ...
Challenges in Engineering Estimates for Best Value Design–Build Highway Projects
Publisher: ASCE
Abstract: Traditional design–bid–build guidelines suggest that engineering estimates should be within +/−10% of the lowest contractor bid and recommend this value as a reference to identify anomalies in the bidding process. This ...
Structured Approach for Best-Value Evaluation Criteria: US Design–Build Highway Procurement
Publisher: ASCE
Abstract: In best-value procurement, current practice shows that cost is frequently more influential than noncost factors, and consequently, the lowest bidder is chosen in most cases; thus, a best-value selection is not achieved. ...