Search
Now showing items 1-2 of 2
A Hybrid Prioritization Model for Funding School Maintenance and Rehabilitation Projects Using Data Envelopment Analysis and Linear Programming Algorithms
Publisher: ASCE
Abstract: Public school buildings often require regular inspections and effective maintenance strategies to ensure their proper functional performance and safety. Because of budget constraints, school buildings always did not receive ...
Risk-Based Inspection Model for Hot Mix Asphalt Pavement Construction Projects
Publisher: ASCE
Abstract: Hot mix asphalt (HMA) is a critical component in highway construction projects. There is a lack of studies that have investigated the causal relationship between inspection activities and quality of HMA pavement. This study ...