Search
Now showing items 1-5 of 5
Preliminary Investigation of Cycle-to-Cycle Variations in a Nonair-Breathing Diesel Engine
Publisher: The American Society of Mechanical Engineers (ASME)
Abstract: The effect of nonair mixtures on cycle-to-cycle variations of cylinder pressure characteristics was investigated experimentally with an indirect-injected (IDI) diesel engine. The engine intake ...
Stochastic Time–Cost Optimization Model Incorporating Fuzzy Sets Theory and Nonreplaceable Front
Publisher: American Society of Civil Engineers
Abstract: In a real construction project, the duration and cost of each activity could change dynamically as a result of many uncertain variables, such as weather, resource availability, productivity, etc. Managers/planners must ...
Online Identification of Shearing and Plowing Constants in End Milling
Publisher: The American Society of Mechanical Engineers (ASME)
Abstract: Online methods for the identification of shearing and plowing cutting constants from forces in a single milling operation are presented. By virtue of the analytical nature of the milling force ...
Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization
Publisher: American Society of Civil Engineers
Abstract: Reducing both project cost and time (duration) is critical in a competitive environment. However, a trade-off between project time and cost is required. This in turn requires contracting organizations to carefully evaluate ...
Applying Pareto Ranking and Niche Formation to Genetic Algorithm-Based Multiobjective Time–Cost Optimization
Publisher: American Society of Civil Engineers
Abstract: Time–cost optimization (TCO) is one of the greatest challenges in construction project planning and control, since the optimization of either time or cost, would usually be at the expense of the other. Although the TCO ...