Model for Evaluating Networks under Correlated Uncertainty—NETCOR
Publisher: American Society of Civil Engineers
Abstract: Construction activities are often influenced by factors such as weather, labor, and site conditions. When several activities are influenced by the same factor, their durations may be correlated. If many activities along a ...
Application Example for Evaluating Networks Considering Correlation
Publisher: American Society of Civil Engineers
Abstract: Current approaches to network scheduling do not consider the correlation between activity durations. When activity durations are correlated, the variability of path and project durations may be increased. High variability ...
Action‐Response Model and Loss of Productivity in Construction
Publisher: American Society of Civil Engineers
Abstract: Unanticipated conditions on a construction project sometimes result in a significant loss of productivity. The conditions that may affect productivity—adverse weather, scheduled overtime, and material shortages, to name a ...