Search
Now showing items 1-3 of 3
Discussion of “Win-Win Concession Period Determination Methodology” by Xueqing Zhang
Publisher: American Society of Civil Engineers
Discussion of “Employing the Net Present Value-Consistent IRR Methods for PFI Contracts” by Y. H. Chiang, Eddie W. L. Cheng, and Patrick T. I. Lam
Publisher: American Society of Civil Engineers
Net Asset Value–Based Concession Duration Model for BOT Contracts
Publisher: American Society of Civil Engineers
Abstract: A concession period is a key decision variable in the arrangement of a build-operate-transfer (BOT)-type contract. Recently, an innovative BOT concession model (BOTCcM) was developed to quantitatively determine the value ...