YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-3 of 3

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Human Resource Allocation for Remote Construction Projects 

    Source: Journal of Management in Engineering:;2011:;Volume ( 027 ):;issue: 001
    Author(s): Kuo-Liang Lin
    Publisher: American Society of Civil Engineers
    Abstract: As the construction industry expands from local markets to global markets, many construction and engineering firms have acquired tenders remotely from their home base. When allocating human resource for the management team ...
    Request PDF

    An Interactive Planning Environment for Critical Operations 

    Source: Journal of Construction Engineering and Management:;1996:;Volume ( 122 ):;issue: 003
    Author(s): Kuo-Liang Lin; Carl T. Haas
    Publisher: American Society of Civil Engineers
    Abstract: In this paper, an interactive critical operations planning environment (COPE) is described for planning critical construction operations involving large semistationary equipment such as cranes, concrete pumps, and manipulators. ...
    Request PDF

    Multiple Heavy Lifts Optimization 

    Source: Journal of Construction Engineering and Management:;1996:;Volume ( 122 ):;issue: 004
    Author(s): Kuo-Liang Lin; Carl T. Haas
    Publisher: American Society of Civil Engineers
    Abstract: Heavy lift planning has a major impact on construction sequencing, scheduling, budgeting, and safety. This paper addresses problems presented by planning for multiple lifts on a single jobsite. This is a common and ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian