YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-8 of 8

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Cost Comparison of Highway Rest Area Operations: In-House Workforce versus Outsourcing Methods 

    Source: Journal of Construction Engineering and Management:;2023:;Volume ( 149 ):;issue: 008:;page 04023062-1
    Author(s): Kishor Shrestha
    Publisher: ASCE
    Abstract: State departments of transportation (DOTs) typically use one of three approaches to operate highway rest areas (RAs): in-house workforce, method-based contracting (MBC), and performance-based contracting (PBC). State DOTs ...
    Request PDF

    Framework to Implement Performance-Based Contracting for Chip-Seal Road Maintenance 

    Source: Journal of Construction Engineering and Management:;2021:;Volume ( 148 ):;issue: 001:;page 04021183
    Author(s): Kishor Shrestha; Pramen P. Shrestha
    Publisher: ASCE
    Abstract: The road maintenance workload for transportation agencies increases every year. To maintain roads effectively, one contracting method state Departments of Transportation (DOTs) use to outsource is performance-based contracting ...
    Request PDF

    Quality of Road Maintenance Work Performed by State Force versus Private Contractors in Nevada 

    Source: Practice Periodical on Structural Design and Construction:;2017:;Volume ( 022 ):;issue: 004
    Author(s): Pramen P. Shrestha; Kishor Shrestha; Mylinh Lidder
    Publisher: American Society of Civil Engineers
    Abstract: In the United States, state departments of transportation (DOTs) use primarily state force (SF) or private contractors to maintain road systems. Private contractors are contracted under method-based contracting (MBC) or ...
    Request PDF

    Data Digitization to Mitigate Legal Disputes during Reconstruction in Earthquake-Prone Areas 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 013 ):;issue: 002:;page 05021001-1
    Author(s): Kishor Shrestha; Rojina Deshar; Krishna P. Kisi; Tommy Taffazzoli
    Publisher: ASCE
    Abstract: Disputes are prevalent on construction projects. This issue is severe in underdeveloped countries like Nepal. In the year 2015, a magnitude 7.8 earthquake killed over 8,000 people and destroyed thousands of buildings there. ...
    Request PDF

    Critical Factors Affecting the Bid Cost of Building Construction Projects 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2023:;Volume ( 015 ):;issue: 003:;page 04523018-1
    Author(s): Kishor Shrestha; Pramen P. Shrestha; Mohamed Lohoud
    Publisher: American Society of Civil Engineers
    Abstract: A cost database is essential for contractors to estimate accurate bid costs, and most contractors use historical cost databases for this purpose. Factors that influence bid cost should be investigated so that they are ...
    Request PDF

    Identification of Geotechnical-Related Factors Impacting Cost, Schedule, and Claims on Roadway Construction Projects 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2023:;Volume ( 015 ):;issue: 004:;page 04523034-1
    Author(s): Kishor Shrestha; Pramen P. Shrestha; Krishna Neupane
    Publisher: ASCE
    Abstract: In construction projects, changes are inevitable and impact cost, schedule, and claims. There are limited studies on geotechnical investigations of factors affecting cost, schedule, and claim increases on the US roadway ...
    Request PDF

    Factors Affecting the Selection of In-House and Outsourcing Road Maintenance Methods and Assessment of Their Benefits 

    Source: Journal of Infrastructure Systems:;2017:;Volume ( 023 ):;issue: 001
    Author(s): Pramen P. Shrestha; Kishor Shrestha; Aly Said; Mylinh Lidder
    Publisher: American Society of Civil Engineers
    Abstract: In the United States, for road maintenance activities, state departments of transportation (DOT) use either in-house resources or outsource to private contractors under various methods, such as method-based contracting ...
    Request PDF

    Framework Development of Performance-Based Striping Maintenance Contracts 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 002
    Author(s): Kishor Shrestha; Pramen P. Shrestha
    Publisher: ASCE
    Abstract: State DOTs have been using traditional contracts with prescriptive specifications to procure road maintenance work. However, performance-based contracts (PBCs) have been used for design-build (DB) projects after the DB ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    ... View More

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian