Float Allocation Using the Total Risk Approach
Publisher: American Society of Civil Engineers
Abstract: Float ownership is one of the controversial issues in the litigation of delay claims. As float time does not always affect the overall project completion time, many believe that this time can be used by any of the project ...
Identifying Pile Installation Risks Using Principal Component Analysis
Publisher: American Society of Civil Engineers
Abstract: Construction activities in Saudi Arabia have surged due to Vision 2030 programs, driving a widespread transformation. However, the pile construction sector still faces significant time and cost overruns, negatively impacting ...