Using Hue, Saturation, and Value Color Space for Hydraulic Excavator Idle Time Analysis
Publisher: American Society of Civil Engineers
Abstract: Accurate analyses of equipment idle time are crucial for the efficient utilization of construction equipment in large construction projects. The less idle time the equipment has, the higher productivity it can achieve. ...
Quantitative Method for Updating Cost Contingency throughout Project Execution
Publisher: American Society of Civil Engineers
Abstract: This paper presents a method for project cost contingency forecasting and updating based on Value at Risk at a certain confidence level during project execution. The method is applied and demonstrated through an ongoing ...