Search
Now showing items 1-1 of 1
Controlling Path and Controlling Segment Analysis in Repetitive Scheduling Method
Publisher: American Society of Civil Engineers
Abstract: The controlling path and controlling segment are the basis for repetitive project scheduling. In this paper the controlling path is defined as the longest path in duration that determines the minimum project duration, ...
CSV
RIS