YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-3 of 3

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Modeling and Forecasting Construction Labor Demand: Multivariate Analysis 

    Source: Journal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 009
    Author(s): James M. W. Wong; Albert P. C. Chan; Y. H. Chiang
    Publisher: American Society of Civil Engineers
    Abstract: This paper presents the development of advanced labor demand forecasting models at project level. A total of 11 manpower demand forecasting models were developed for the total project labor and ten essential trades. Data ...
    Request PDF

    Modeling Construction Occupational Demand: Case of Hong Kong 

    Source: Journal of Construction Engineering and Management:;2010:;Volume ( 136 ):;issue: 009
    Author(s): James M. W. Wong; Albert P. C. Chan; Y. H. Chiang
    Publisher: American Society of Civil Engineers
    Abstract: Appropriate training can only be developed if training needs for specific skills are carefully identified. This paper, further to an aggregate model developed previously, aims to forecast the occupational share of the ...
    Request PDF

    Empirical Study of the Risks and Difficulties in Implementing Guaranteed Maximum Price and Target Cost Contracts in Construction 

    Source: Journal of Construction Engineering and Management:;2010:;Volume ( 136 ):;issue: 005
    Author(s): Daniel W. M. Chan; Albert P. C. Chan; Patrick T. I. Lam; James M. W. Wong
    Publisher: American Society of Civil Engineers
    Abstract: Over the past few decades, both the guaranteed maximum price (GMP) and target cost contracting (TCC) arrangements have been regarded as alternative integrated procurement strategies for clients to mitigate risks, minimize ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian