YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-3 of 3

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Improved Baseline Method to Calculate Lost Construction Productivity 

    Source: Journal of Construction Engineering and Management:;2014:;Volume ( 140 ):;issue: 002
    Author(s): Tong Zhao; J. Mark Dungan
    Publisher: American Society of Civil Engineers
    Abstract: The measured mile/baseline method has been widely accepted to quantify labor productivity loss, which is demonstrated by comparing the impacted and unimpacted/lightly impacted portions of the work. Although the distinctions ...
    Request PDF

    Loss of Productivity Analysis Using Project-Specific Curves 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2019:;Volume ( 011 ):;issue: 004
    Author(s): Tong Zhao; J. Mark Dungan
    Publisher: American Society of Civil Engineers
    Abstract: It is a difficult and challenging task to quantify lost labor productivity in construction claims. Project-specific studies, such as the measured mile analysis, for calculating loss of productivity are generally more ...
    Request PDF

    Pilot Investigation of Underestimates: Likelihood, Severity, and Impact on Productivity 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 013 ):;issue: 004:;page 04521021-1
    Author(s): Tong Zhao; J. Mark Dungan
    Publisher: ASCE
    Abstract: Labor productivity is susceptible to many factors, including those related to working conditions, methods, and construction resources. It is not uncommon to see that contractors performed the work in a different manner ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian