Improved Baseline Method to Calculate Lost Construction Productivity
Publisher: American Society of Civil Engineers
Abstract: The measured mile/baseline method has been widely accepted to quantify labor productivity loss, which is demonstrated by comparing the impacted and unimpacted/lightly impacted portions of the work. Although the distinctions ...
Loss of Productivity Analysis Using Project-Specific Curves
Publisher: American Society of Civil Engineers
Abstract: It is a difficult and challenging task to quantify lost labor productivity in construction claims. Project-specific studies, such as the measured mile analysis, for calculating loss of productivity are generally more ...
Pilot Investigation of Underestimates: Likelihood, Severity, and Impact on Productivity
Publisher: ASCE
Abstract: Labor productivity is susceptible to many factors, including those related to working conditions, methods, and construction resources. It is not uncommon to see that contractors performed the work in a different manner ...