YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-4 of 4

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Construction Planning Method Using Case-Based Reasoning (CONPLA-CBR) 

    Source: Journal of Computing in Civil Engineering:;2007:;Volume ( 021 ):;issue: 006
    Author(s): Han-Guk Ryu; Hyun-Soo Lee; Moonseo Park
    Publisher: American Society of Civil Engineers
    Abstract: During the construction process, there occur many unexpected events that hinder timely completion of a project. One plausible solution in formulating a robust plan against such uncertainties is to provide the proper ...
    Request PDF

    Method for Calculating Schedule Delay Considering Lost Productivity 

    Source: Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 011
    Author(s): Hyun-Soo Lee; Han-Guk Ryu; Jung-Ho Yu; Jae-Jun Kim
    Publisher: American Society of Civil Engineers
    Abstract: A delay claim often occurs when a difference between the actual completion date and the contract completion date exists. The duration of a delay is an essential piece of information required for determining the cause of a ...
    Request PDF

    Probabilistic Duration Estimation Model for High-Rise Structural Work 

    Source: Journal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 012
    Author(s): Hyun-soo Lee; Jae-won Shin; Moonseo Park; Han-Guk Ryu
    Publisher: American Society of Civil Engineers
    Abstract: The duration of a construction project is a key factor to consider before starting a new project, as it can determine project success or failure. Despite the high level of uncertainty and risk involved in construction, ...
    Request PDF

    Transaction-Cost-Based Selection of Appropriate General Contractor-Subcontractor Relationship Type 

    Source: Journal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 011
    Author(s): Hyun-soo Lee; Joon-oh Seo; Moonseo Park; Han-guk Ryu; Soon-seok Kwon
    Publisher: American Society of Civil Engineers
    Abstract: Relationships between general contractors and subcontractors are generally formed on a project-by-project basis. However, because of the competitive nature of the construction industry, this traditional arrangement can ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian