Search
Now showing items 1-5 of 5
Construction Projects Bid or Not Bid Approach Using the Fuzzy Technique for Order Preference by Similarity FTOPSIS Method
Publisher: American Society of Civil Engineers
Arbitration in Kuwait: Study of Current Practices and Suggestions for Improvements
Publisher: American Society of Civil Engineers
Abstract: In the construction industry, disputes are inevitable. Contract disputes result from conflicting contract documents, changes to the original scope of work, or breaches of contract. Arbitration is the preferred alternative ...
New Approach to Model Material-Related Problems Contributing to Project Delays Using Rotational Fuzzy Set
Publisher: American Society of Civil Engineers
Abstract: Construction projects often suffer from material unavailability, which results in failure to meet set schedules. Subjective judgment is commonly used to describe the level of material availability for such projects. ...
Construction Safety in Kuwait
Publisher: American Society of Civil Engineers
Abstract: In gulf region countries like Kuwait, the construction process can become very challenging. In this paper, we analyze construction-related accidents in Kuwait including type of accident, type of injury, body part injured, ...
Safety Assessment in Tunnel Grouting Using Fuzzy Rotational and Angular Models
Publisher: American Society of Civil Engineers
Abstract: Grouting operations in sewage tunnel construction are performed to prevent water inflow and to strengthen and solidify the ring shape of the tunnel. Such operations have hazards. Safety assessments of these operations often ...