YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-3 of 3

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Cost, Change Order, and Schedule Performance of Highway Projects 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 014 ):;issue: 001:;page 04521044
    Author(s): Bandana Shrestha; Pramen P. Shrestha; Ruiko Maharjan; Douglas Gransberg
    Publisher: ASCE
    Abstract: Costs, change orders, and schedule performances of highway projects built using the design-bid-build (DBB) method by state departments of transportation have been tracked for more than five decades. As technology improves, ...
    Request PDF

    Confidentiality Issues with Alternative Technical Concepts during Design-Build Project Procurement 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 001
    Author(s): Ghada M. Gad; Michael C. Loulakis; Douglas Gransberg
    Publisher: ASCE
    Abstract: Research has shown that maintaining confidentiality is critical to creating an environment where competing design-builders feel comfortable disclosing innovative alternative technical concepts (ATCs) during the procurement ...
    Request PDF

    Risk Identification, Prioritization, and Mapping for Early Construction Cost Contingency in Transportation Infrastructure Projects 

    Source: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering:;2024:;Volume ( 010 ):;issue: 003:;page 04024050-1
    Author(s): Taewoo Ko; Chau Le; H. David Jeong; Phuong Nguyen; Kunhee Choi; Douglas Gransberg
    Publisher: American Society of Civil Engineers
    Abstract: State Departments of Transportation (DOTs) require reliable early construction cost estimates for project budgeting. Typically, project budgets are established early in the development process before finalizing a project’s ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    ... View More

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian