Search
Now showing items 1-1 of 1
Evaluation, Rehabilitation Planning, and Stay-Cable Replacement Design for the Hale Boggs Bridge in Luling, Louisiana
Publisher: American Society of Civil Engineers
Abstract: The Hale Boggs Bridge opened to traffic on October 5, 1983. At the time, it was the first U.S. cable-stayed crossing over the Mississippi River. The PE (polyethylene) protective sheathing was damaged in many of the cables ...
CSV
RIS