YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-10 of 10

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Optimization of Capital Structure for Urban Water PPP Projects Using Mezzanine Financing: Sustainable Perspective 

    Source: Journal of Construction Engineering and Management:;2023:;Volume ( 149 ):;issue: 008:;page 04023059-1
    Author(s): Yijing Li; Nan He; Yaqiong Zhang; Huimin Li; Chengyi Zhang
    Publisher: ASCE
    Abstract: An optimal capital structure can minimize financing cost and maximize project value. Most existing studies have focused on the equity-debt financing mode for public–private partnership (PPP) projects, neglecting the usage ...
    Request PDF

    Investigating the Critical Success Factors of Claims Management in Construction Contracts 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2022:;Volume ( 015 ):;issue: 002:;page 04522066-1
    Author(s): Emine Gokce Cinko; Sevilay Demirkesen; Emel Sadikoglu; Chengyi Zhang
    Publisher: ASCE
    Abstract: Claims management is an essential process aiming to avoid, mitigate, evaluate, and handle claims that may arise for various reasons. Claims usually bring up a considerable cost burden and can be disruptive, often resulting ...
    Request PDF

    Neurophysiological Evaluation of Ethics Training for Improved Decision-Making and Legal Compliance in the Construction Industry 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2025:;Volume ( 017 ):;issue: 003:;page 04525039-1
    Author(s): Peng Liu; Uttam Kumar Pal; Chengyi Zhang
    Publisher: American Society of Civil Engineers
    Abstract: Ethical decision-making is a critical issue in the construction industry, where stakeholders often face complex situations that require balancing safety, integrity, efficiency, and legal compliance. This study explores the ...
    Request PDF

    Developing a Construction Delay Prediction Model as a Delay-Avoidance Strategy for Public Construction Projects 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2025:;Volume ( 017 ):;issue: 003:;page 04525027-1
    Author(s): Merina Giri; Chengyi Zhang; Ayoola Olorunnishola; Srishti Hada; Uttam Kumar Pal
    Publisher: American Society of Civil Engineers
    Abstract: Delays in construction projects result in financial losses, project mismanagement, and conflicts between stakeholders. Although previous research has identified general factors contributing to delays, many studies primarily ...
    Request PDF

    Academia and Industry Perceptions of Construction Planning and Scheduling Education 

    Source: Journal of Civil Engineering Education:;2022:;Volume ( 148 ):;issue: 003:;page 04022005
    Author(s): Huimin Li; Chengyi Zhang; Yingjie Liu; David Arditi; Chenchen Xu; Euysup Shim
    Publisher: ASCE
    Abstract: For construction management students completing the construction planning and scheduling course to meet work expectations and provide effective benefit to their employers, the course curriculum should accurately reflect ...
    Request PDF

    Compromise or Problem Solve: Conflicts in Construction Schedule Updates 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2024:;Volume ( 016 ):;issue: 001:;page 04523056-1
    Author(s): Muskan Sharma Kuinkel; Chengyi Zhang; Garrett Felton; Sevilay Demirkesen; Huimin Li
    Publisher: ASCE
    Abstract: Construction projects often require frequent schedule updates to accurately represent construction progress, identify potential delays, prepare progress payment applications, and utilize updated schedules as admissible ...
    Request PDF

    Machine Learning–Based Predictive Model for Dispute Occurrence and Resolution Strategies in Pipeline Projects 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2025:;Volume ( 017 ):;issue: 003:;page 04525036-1
    Author(s): Saksham Timalsina; Chengyi Zhang; Ulrike Quapp; Sevilay Demirkesen; Ayoola Olorunnishola
    Publisher: American Society of Civil Engineers
    Abstract: Pipeline projects present complex legal challenges due to their extensive scope and multifaceted impacts. These challenges often lead to land use conflicts, environmental compliance issues, regulatory hurdles, and internal ...
    Request PDF

    Comparative Analysis of Regulatory Compliance and Legal Issues in Small Modular Nuclear Reactor Deployment 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2025:;Volume ( 017 ):;issue: 003:;page 04525031-1
    Author(s): Uttam Kumar Pal; Chengyi Zhang; Saksham Timalsina; Ulrike Quapp; Huimin Li
    Publisher: American Society of Civil Engineers
    Abstract: The deployment of small modular reactors (SMRs) is a critical pathway toward achieving clean and reliable energy solutions globally. However, the pace and success of SMR deployment vary significantly across different ...
    Request PDF

    Reducing Liability in Urban Work Zones by Quantifying Risks and Enhancing Layout Design and Regulations 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2025:;Volume ( 017 ):;issue: 003:;page 04525013-1
    Author(s): Peng Liu; Chengyi Zhang; Uttam Kumar Pal; Merina Giri
    Publisher: American Society of Civil Engineers
    Abstract: Few researchers have investigated work zone layout design, noting that it does not adequately mitigate the risks associated with lane-changing behaviors. This gap may create unsafe conditions and increase the likelihood ...
    Request PDF

    Tournament Incentive Mechanisms Design for Long-Distance Water Diversion Projects Incorporating Preference Heterogeneity 

    Source: Journal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 006:;page 04022036
    Author(s): Lelin Lv; Zhuofu Wang; Huimin Li; Chengyi Zhang; Ran Qiao
    Publisher: ASCE
    Abstract: The owner often entrusts multiple contractors to construct in parallel due to the linear distribution of a long-distance water diversion project (LDWDP). However, multiple contractors with more information are more likely ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    ... View More

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian