Constructability Practices among Construction Contractors in Indonesia
Publisher: American Society of Civil Engineers
Abstract: The concept of constructability in the United States or buildability in the United Kingdom emerged in the late 1970s, which evolved from studies into how improvement can be achieved to increase cost efficiency and quality ...
Modification of Advanced Programmatic Risk Analysis and Management Model for the Whole Project Life Cycle’s Risks
Publisher: American Society of Civil Engineers
Abstract: The advanced programmatic risk analysis and management model (APRAM) is one of the recently developed methods that can be used for risk analysis and management purposes considering schedule, cost, and quality risks ...
Proximity Activity Intensity Identification System in Hot and Humid Weather Conditions: Development and Implementation
Publisher: ASCE
Abstract: Construction workers are exposed to heat stress risks due to the combined effects of hot and humid weather conditions (HHWCs) and physically demanding work. A real-time activity intensity identification (AII) is required ...