YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-10 of 27

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Predicting the Volatility of Highway Construction Cost Index Using Long Short-Term Memory 

    Source: Journal of Management in Engineering:;2020:;Volume ( 036 ):;issue: 004
    Author(s): Yang Cao; Baabak Ashuri
    Publisher: ASCE
    Abstract: The highway construction cost index (HCCI) is a composite indicator that reflects the price trend of the highway construction industry. Most available indexes exhibit significant variation, creating a challenge for state ...
    Request PDF

    Text Mining of the Securities and Exchange Commission Financial Filings of Publicly Traded Construction Firms Using Deep Learning to Identify and Assess Risk 

    Source: Journal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 012
    Author(s): Yashovardhan Jallan; Baabak Ashuri
    Publisher: ASCE
    Abstract: Risk factor identification is a critical topic in the construction industry. It is vital for the various construction firms and industry stakeholders to understand the different types of risks that affect their businesses ...
    Request PDF

    State of Private Financing in Development of Highway Projects in the United States 

    Source: Journal of Management in Engineering:;2015:;Volume ( 031 ):;issue: 006
    Author(s): Baabak Ashuri; Kia Mostaan
    Publisher: American Society of Civil Engineers
    Abstract: The U.S. Department of Transportation and state DOTs across the nation seek private investments to leverage their shrinking financial resources and fulfill their growing funding shortfalls. The decision to involve the ...
    Request PDF

    Shuffled Frog-Leaping Model for Solving Time-Cost-Resource Optimization Problems in Construction Project Planning 

    Source: Journal of Computing in Civil Engineering:;2015:;Volume ( 029 ):;issue: 001
    Author(s): Baabak Ashuri; Mehdi Tavakolan
    Publisher: American Society of Civil Engineers
    Abstract: Time-cost-resources usage variation trade-off analysis is one of the most challenging tasks of construction project planners. Project planners face complicated multivariate, time-cost-resource optimization (TCRO) problems, ...
    Request PDF

    Time Series Analysis of ENR Construction Cost Index 

    Source: Journal of Construction Engineering and Management:;2010:;Volume ( 136 ):;issue: 011
    Author(s): Baabak Ashuri; Jian Lu
    Publisher: American Society of Civil Engineers
    Abstract: Every month,
    Request PDF

    Fuzzy Enabled Hybrid Genetic Algorithm–Particle Swarm Optimization Approach to Solve TCRO Problems in Construction Project Planning 

    Source: Journal of Construction Engineering and Management:;2012:;Volume ( 138 ):;issue: 009
    Author(s): Baabak Ashuri; Mehdi Tavakolan
    Publisher: American Society of Civil Engineers
    Abstract: One of the most challenging tasks of a construction project planner is to simultaneously minimize the total project cost and total project duration while considering issues related to optimal resource allocation and resource ...
    Request PDF

    Key Challenges to Design Professional Liability in the Design-Build Environment 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 003
    Author(s): Jung Hyun Lee; Yuxin Zhou; Baabak Ashuri
    Publisher: ASCE
    Abstract: In the integrated environment of design-build (DB), design risk is transferred from the owner to the DB team. One significant challenge to DB projects is design liability. This study discusses important challenges related ...
    Request PDF

    Improving the Management Practices for Right-of-Way Acquisition Process 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 014 ):;issue: 001:;page 04521038
    Author(s): Frederick Chung; Minsoo Baek; Baabak Ashuri
    Publisher: ASCE
    Abstract: The objective of this project is to identify current management practices developed by various state departments of transportation (DOTs) for right of way (ROW) acquisition and explore possible ways to expedite the process. ...
    Request PDF

    Key Challenges in Megabridge Design–Build Project Procurement 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 014 ):;issue: 001:;page 04521039
    Author(s): Raymond M. Moran; Ibrahim Odeh; Baabak Ashuri
    Publisher: ASCE
    Abstract: Megabridge projects are those that cost more than $500 million to complete from the planning stages through completion of construction. In the evolving field of transportation design–build (DB) project delivery, it ...
    Request PDF

    Forecasting the Construction Expenditure Cash Flow for Transportation Design-Build Projects with a Case-Based Reasoning Model 

    Source: Journal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 006:;page 04021043-1
    Author(s): Yunping Liang; Baabak Ashuri; Mingshu Li
    Publisher: ASCE
    Abstract: Accurately forecasting the construction expenditure cash flow of transportation projects is critical for state departments of transportation (state DOTs) to secure sufficient funding to cover their fiscal obligations ...
    Request PDF
    • 1
    • 2
    • 3
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    ... View More

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian