YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-2 of 2

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Project Owners’ Motivation for Delivering Green Building Projects 

    Source: Journal of Construction Engineering and Management:;2017:;Volume ( 143 ):;issue: 009
    Author(s): Ayokunle Olubunmi Olanipekun; Bo (Paul) Xia; Carol Hon; Yi Hu
    Publisher: American Society of Civil Engineers
    Abstract: Project owners play a vital role in delivering green building projects in the building sector. However, their motivation for effective delivery of green building projects is currently unknown due to limited studies on the ...
    Request PDF

    A Coupled Genetic Programming Monte Carlo Simulation–Based Model for Cost Overrun Prediction of Thermal Power Plant Projects 

    Source: Journal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 008:;page 04022073
    Author(s): Muhammad Saiful Islam; Saeed Reza Mohandes; Amir Mahdiyar; Alireza Fallahpour; Ayokunle Olubunmi Olanipekun
    Publisher: ASCE
    Abstract: Globally, power projects are prone to cost overrun projects. Within the body of knowledge, previous studies have paid less attention to predicting the cost overruns to assist contingency cost planning. Particularly, in ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian