YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-10 of 61

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Risk Allocation and Increased Claims in the Construction Industry 

    Source: Journal of Professional Issues in Engineering Education and Practice:;2007:;Volume ( 133 ):;issue: 001
    Author(s): Awad S. Hanna
    Publisher: American Society of Civil Engineers
    Request PDF

    Closure to “State of Practice of Building Information Modeling in the Electrical Construction Industry” by Awad S. Hanna, Michael Yeutter, and Diane G. Aoun 

    Source: Journal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 003
    Author(s): Awad S. Hanna
    Publisher: American Society of Civil Engineers
    Request PDF

    Closure to “Quantitative Definition of Projects Impacted by Change Orders” by Awad S. Hanna, Richard Camlic, Pehr A. Peterson, and Erik V. Nordheim 

    Source: Journal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 004
    Author(s): Awad S. Hanna
    Publisher: American Society of Civil Engineers
    Request PDF

    Benchmark Performance Metrics for Integrated Project Delivery 

    Source: Journal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 009
    Author(s): Awad S. Hanna
    Publisher: American Society of Civil Engineers
    Abstract: The construction industry is fraught with waste and inefficiencies resulting in projects often failing to meet owners’ expectations. Integrated project delivery (IPD) is the newest project delivery system (PDS) and changes ...
    Request PDF

    Using the Earned Value Management System to Improve Electrical Project Control 

    Source: Journal of Construction Engineering and Management:;2012:;Volume ( 138 ):;issue: 003
    Author(s): Awad S. Hanna
    Publisher: American Society of Civil Engineers
    Abstract: In many cases, disorganized cost and schedule tracking practices, as well as inaccurate data collection, cause many projects to experience distress and possible profit loss. This paper introduces an earned value management ...
    Request PDF

    Closure to “Cumulative Effect of Project Changes for Electrical and Mechanical Construction” by Awad S. Hanna, Richard Camlic, Pehr A. Peterson, and Min-Jae Lee 

    Source: Journal of Construction Engineering and Management:;2006:;Volume ( 132 ):;issue: 005
    Author(s): Awad S. Hanna
    Publisher: American Society of Civil Engineers
    Request PDF

    Closure to “State of Practice of Building Information Modeling in the Electrical Construction Industry” by Awad S. Hanna, Michael Yeutter, and Diane G. Aoun 

    Source: Journal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 003
    Author(s): Awad S. Hanna
    Publisher: American Society of Civil Engineers
    Request PDF

    Defining the Success Status of Construction Projects Based on Quantitative Performance Metrics Thresholds 

    Source: Journal of Management in Engineering:;2023:;Volume ( 039 ):;issue: 002:;page 04022073-1
    Author(s): Eyad Aboseif; Awad S. Hanna
    Publisher: American Society of Civil Engineers
    Abstract: Despite the high spending and high employment, the construction industry struggles to agree how to go about project performance assessment and what constitutes a successful project. This does not allow stakeholders to ...
    Request PDF

    Clarifying Design Responsibility and Its Risk Allocation in Construction Contracts 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2023:;Volume ( 015 ):;issue: 002:;page 04522055-1
    Author(s): Awad S. Hanna; Eyad Aboseif
    Publisher: American Society of Civil Engineers
    Abstract: Disputes related to responsibility for design defects can cause significant financial costs and delays. Consequently, the allocation of risks pertaining to design responsibility is a hot-button issue in construction. This ...
    Request PDF

    Risk Allocation by Law—Cumulative Impact of Change Orders 

    Source: Journal of Professional Issues in Engineering Education and Practice:;2007:;Volume ( 133 ):;issue: 001
    Author(s): Awad S. Hanna; Justin Swanson
    Publisher: American Society of Civil Engineers
    Abstract: Change, defined as any event that results in a modification of the original scope, execution time, or cost of work, is inevitable on most construction projects due to the uniqueness of each project and the limited resources ...
    Request PDF
    • 1
    • 2
    • 3
    • 4
    • . . .
    • 7
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    ... View More

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian