Search
Now showing items 1-1 of 1
Gowanus Canal Superfund Site. III: Leaching of In Situ Stabilization/Solidification Mix Designs
Publisher: ASCE
Abstract: An in situ stabilization/solidification (in situ S/S or ISS) field pilot was conducted in the Gowanus Canal on the manufactured gas plant (MGP) impacted sediments using 9 mix designs including 5%–10% by dry weight (wt%) ...
CSV
RIS