Show simple item record

contributor authorD. A. Summers
contributor authorC. R. Barker
date accessioned2017-05-08T23:10:54Z
date available2017-05-08T23:10:54Z
date copyrightJune, 1981
date issued1981
identifier issn0195-0738
identifier otherJERTD2-26382#147_1.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/94433
description abstractCurrent methods of in-situ gasification require that inter-well connection be by means of either reverse combustion burning or by directional drilling. High-pressure water jet drills concentrate the energy of cutting in a small area and the total thrust required to advance this system is thus minimized. This has been used advantageously to develop a drill for coal seams which can be lowered down a vertical well turned through a 90-deg angle and then advanced horizontally through the coal. A test unit operating at a pressure of 70 MPa and a flow rate of 90 L/min has been used to demonstrate, in a surface trial, the practicality of this concept for interconnecting two in-situ gasification wells located 20 m apart.
publisherThe American Society of Mechanical Engineers (ASME)
titlePotential Advantages to Water Jet Drilling for Use in In-Situ Coal Gasification Processes
typeJournal Paper
journal volume103
journal issue2
journal titleJournal of Energy Resources Technology
identifier doi10.1115/1.3230827
journal fristpage147
journal lastpage152
identifier eissn1528-8994
keywordsDrilling
keywordsCoal
keywordsFuel gasification
keywordsWater
keywordsDrills (Tools)
keywordsCombustion
keywordsWells
keywordsPressure
keywordsFlow (Dynamics)
keywordsThrust
keywordsHigh pressure (Physics) AND Cutting
treeJournal of Energy Resources Technology:;1981:;volume( 103 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record