contributor authorAhmed B. Senouci
contributor authorHojjat Adeli
date accessioned2017-05-08T22:41:45Z
date available2017-05-08T22:41:45Z
date copyrightFebruary 2001
date issued2001
identifier other%28asce%290733-9364%282001%29127%3A1%2828%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/86822
description abstractThis paper presents a mathematical model for resource scheduling considering project scheduling characteristics generally ignored in prior research, including precedence relationships, multiple crew-strategies, and time cost trade-off. Previous resource scheduling formulations have traditionally focused on project duration minimization. The proposed model considers the total project cost minimization. Furthermore, resource leveling and resource-constrained scheduling have traditionally been solved independently. In the new formulation, resource leveling and resource-constrained scheduling are performed simultaneously. The proposed model is solved using the patented neural dynamics model of Adeli and Park. A case study is presented to demonstrate the performance of the method under various resource availability profiles.
publisherAmerican Society of Civil Engineers
titleResource Scheduling Using Neural Dynamics Model of Adeli and Park
typeJournal Paper
journal volume127
journal issue1
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(2001)127:1(28)
treeJournal of Construction Engineering and Management:;2001:;Volume ( 127 ):;issue: 001
contenttypeFulltext