Show simple item record

contributor authorJames E. Rowings
contributor authorMark O. Federle
contributor authorJennifer Rusk
date accessioned2017-05-08T22:40:40Z
date available2017-05-08T22:40:40Z
date copyrightJanuary 2000
date issued2000
identifier other%28asce%290733-9364%282000%29126%3A1%2815%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/86112
description abstractThis paper reports on a project sponsored by the Electrical Contracting Foundation that examined the design/build (D/B) approach and the various dimensions of the decision process that electrical contractors consider before entering this emerging marketplace. Electrical contractors were surveyed regarding many different aspects of D/B and how those factors impact their business. The survey revealed several important trends and preferences among electrical contractors. One area identified in the survey worthy of note is that many of the electrical contractors felt ill prepared to embark on D/B with their current understanding of the issues.
publisherAmerican Society of Civil Engineers
titleDesign/Build Methods for Electrical Contracting Industry
typeJournal Paper
journal volume126
journal issue1
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(2000)126:1(15)
treeJournal of Construction Engineering and Management:;2000:;Volume ( 126 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record