Show simple item record

contributor authorAkira Kitamura
contributor authorYuzo Takeuchi
date accessioned2017-05-08T22:40:15Z
date available2017-05-08T22:40:15Z
date copyrightMarch 1983
date issued1983
identifier other%28asce%290733-9364%281983%29109%3A1%2825%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/85833
description abstractThe Seikan Tunnel in Japan is a long undersea tunnel with a total length of 53.850 km that links the islands of Honshu and Hokkaido. Tunnel excavation began in 1971 after a quarter of a century of survey activities. Along with the progress in the excavation and construction of the tunnel, a variety of technologies were developed. The progress of the construction and the pilot boring and grouting methods used to overcome the invasion of seawater, and the excavation methods used to cope with huge soil pressures are presented. The geological characteristics of the seabed are also described.
publisherAmerican Society of Civil Engineers
titleSeikan Tunnel
typeJournal Paper
journal volume109
journal issue1
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1983)109:1(25)
treeJournal of Construction Engineering and Management:;1983:;Volume ( 109 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record