Show simple item record

contributor authorHyun Jeong Choo
contributor authorIris D. Tommelein
contributor authorGlenn Ballard
contributor authorTodd R. Zabelle
date accessioned2017-05-08T22:39:56Z
date available2017-05-08T22:39:56Z
date copyrightJune 1999
date issued1999
identifier other%28asce%290733-9364%281999%29125%3A3%28151%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/85634
description abstractA database program called WorkPlan has been created to systematically develop weekly work plans. Such work plans are used by crew foremen in scheduling work packages and allocating available labor and equipment resources. WorkPlan adopts the Last Planner methodology, which implements several lean construction techniques. A week prior to conducting work, WorkPlan guides the user step by step through the process of spelling out work packages, identifying constraints, checking constraint satisfaction, releasing work packages, and allocating resources; then at the end of the week, collecting field progress data and reasons for plan failure. This systematic approach helps the user create quality work plans and learn from understanding reasons for failure. The lean planning philosophy underlying WorkPlan and the functionality of the computer program implementation are detailed in this paper. Various ways of displaying work package data are illustrated. WorkPlan's job-shop scheduling view complements the view traditionally adopted by project management, as is reflected in scheduling tools using the critical-path method.
publisherAmerican Society of Civil Engineers
titleWorkPlan: Constraint-Based Database for Work Package Scheduling
typeJournal Paper
journal volume125
journal issue3
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1999)125:3(151)
treeJournal of Construction Engineering and Management:;1999:;Volume ( 125 ):;issue: 003
contenttypeFulltext