description abstractConstruction contractors are often faced with projects containing multiple units wherein activities repeat from unit to unit. These projects require schedules that ensure the uninterrupted usage of resources from an activity in one unit to a similar activity in the next unit. The critical path method (CPM) cannot assure this requirement because only technical precedence and resource availability constraints are explicitly shown in CPM networks. The repetitive scheduling method (RSM) described in this paper recognizes the technical constraints of CPM and also includes an additional resource continuity constraint to ensure continuous resource usage. RSM is a scheduling methodology that simplifies and generalizes various multiunit scheduling procedures previously proposed by several authors and it is known by a number of different names. It applies to both vertical and horizontal projects containing either discrete or continuous activities. An RSM schedule is presented graphically as an
publisherAmerican Society of Civil Engineers
titleScheduling Projects with Repeating Activities
typeJournal Paper
journal volume124
journal issue4
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1998)124:4(269)
treeJournal of Construction Engineering and Management:;1998:;Volume ( 124 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record